Manufacturer of Packaged Drinking Water Plant
Following Facilities & machineries will be required to start up a package drinking water project.
Primary Requirement:
- Borewell OR raw water source
- Raw Water Storage Tank as per Plant Capacity
- Constructed Area (Flooring, Walls, ceiling and Partitions as per BIS requirement)
- Power supply
- Laboratories facility (As per BIS requirement)
Water Filtration:
- RO plant (with Pre filtration, RO system, UV, Ozonation and Storage Tank) (Capacity Liter per hour : 500, 1000, 2000, 3000, 5000 and More)
Packaging Machineries: (As per requirement)
- PET Blow Molding Machine (Capacity Bottle per Hour: 700, 2400, 4800)
- Rinsing, Filling & Capping Machine (for0.5L, 1L & 2 Liter Bottle) with Conveyor, Shrink tunnel and Printer. (Capacity Bottle per Hour: 700, 1400, 2400, 3600)
- Pouch Packing Machine (Capacity Pouch per Hour: 2200)
- 20 Liter Jar Rinsing, Filling and Capping Machine (Capacity Jar Per Hour: 200 )
- Automatic Glass Rinsing, Filling & Sealing (Capacity Cup Per Hour: 1400-1500 )
Bottling Machines
Blow Moulding Machine
Aotomatic Rotary (Station) Bottle Rinsing Filling & Capping Machine
Semi Auto Botteling Machine


Jar Washing Machine
Pouch Packing Machine